People

Business

William Kaipa

Runs ESCOM, which carries and sells Malawi's electricity, and has promised to ease load shedding.

14views

Quick answer: William Kaipa is the Malawian engineer who has led the Electricity Supply Corporation of Malawi (ESCOM) since 1 April 2026. He spent most of a 37-year career in South Africa, including senior engineering roles at Eskom, before coming home to run the utility that transmits and sells the country’s power.

Career

From Eskom to ESCOM

Kaipa studied engineering at the University of Malawi and later took a master’s degree in engineering management at the University of Pretoria. He is registered with the Engineering Council of South Africa.

Most of his career was in South Africa. At Eskom, the national power company, he was lead mechanical engineer on the R3.5 billion Ingula Pumped Storage Scheme, worked on the Majuba underground coal gasification pilot plant, and held senior roles at Lethabo Power Station improving plant performance. He also held senior posts at Airports Company South Africa and the engineering firm Arup.

William Kaipa speaking at the launch of ESCOM's fault clearing initiative
April 2026

Hired to fix the grid

ESCOM’s board appointed him chief executive from 1 April 2026 after what it called an expedited and targeted search, citing the critical state of the power sector. He took over from Kamkwamba Kumwenda, who was moved to the Malawi University of Business and Applied Sciences in November 2025.

Introducing him to management, board chair Alfred Nhlema set the bar: “The Board did not appoint Engineer William Kaipa to manage continuity; we appointed him to lead transformation.”

William Kaipa, seated left, with ESCOM and Press Energy officials after signing the transmission connection agreement
2026

The eight-month promise

In June 2026, signing a deal to connect Press Energy’s planned 50MW solar plant at Nkhoma in Lilongwe, he repeated the pledge he made on arrival. “In April, we made a promise to Malawians that within eight months we would improve power supply in the country and address the challenge of load shedding,” he said. Eight months from April runs to about the end of 2026.

In October 2026 ESCOM signed grid connection agreements for two more plants: a 75MW multifuel thermal plant by AZA Power Solutions at Nanjoka in Salima, which ESCOM says would raise baseload capacity by 17 percent, and a 50MW solar plant by Quantel at the New Bwengu substation in Mzimba. All three plants are still being developed.

William Kaipa at the parliamentary committee briefing in June 2026
Running ESCOM

Faults, bills and customers

In November 2026 ESCOM launched a fault clearing initiative with motorbikes for technicians, smaller fault zones and a mobile app that assigns reported faults to staff in the field. “The mobile app will be used to assign faults to technicians in the field,” Kaipa said.

ESCOM has also chased unpaid bills. In September 2026 Kaipa signed a letter warning Blantyre Water Board that its head office would be disconnected unless it paid K1.6 billion it owed.

William Kaipa shows one of ESCOM's new fault clearing motorbikes to officials
Fact file

William Kaipa

Full name
William Kaipa
Job
Chief executive, Electricity Supply Corporation of Malawi (ESCOM) Limited
In office
From 1 April 2026
Education
BSc Engineering, University of Malawi; master’s in engineering management, University of Pretoria
Before ESCOM
Eskom (Ingula, Majuba, Lethabo), Airports Company South Africa, Arup
Questions

FAQ

Who is the CEO of ESCOM?

William Kaipa, an engineer who took over on 1 April 2026.

Where did William Kaipa work before ESCOM?

Mostly in South Africa: at Eskom, where he was lead mechanical engineer on the Ingula pumped storage scheme, and at Airports Company South Africa and Arup.

When will load shedding end in Malawi?

Kaipa promised in April 2026 to improve supply and address load shedding within eight months, which runs to about the end of 2026. The plants ESCOM signed up in 2026 are still being developed.

What is the difference between ESCOM and Egenco?

Egenco generates electricity. ESCOM buys it, transmits it and sells it to customers. They were one company until 2017.

Keep reading

More on Zaku